Status

Awarded


Dueck Isuzu

Dueck Isuzu

Closing Date

January 16, 2018


Revised October 5, 2020

Contact

Richard D. Oppelt
Purchasing Manager
Finance Department
Tel: (604) 590-7274
Email: purchasing@surrey.ca

Request for Quotations

General Description
It is the intent of the specifications to provide for the purchase of a new and unused 2018 model truck in cab over engine configuration.  The vehicle shall have a gaseous prepared engine, capable of running dual fuels (CNG and Gasoline).  The vehicle shall be supplied with factory approved CNG conversion, and shall be warranted by the vehicle manufacturer.  Conversions which are not factory approved or carry the vehicle manufacturers warranty are not acceptable. The Contractor should provide details of the layout and configuration of the installed CNG tanks.  The installation of the tanks shall be done in a manner as to maximize the load carrying space of the trucks. Design concept drawings shall be provided at the time of the submission.

Specifications of Goods
Refer to Schedule A-1 -Technical Specifications in RFQ document.

The Services include, but are not limited to the following:

  • Supply and Delivery of One (1) or More 14,500lb GVW (minimum) Cab Over Engine Configuration Dual Fuel (CNG & Gasoline) Truck with Tipping Deck Specialist Body for Garbage Collection.
  • Provision of local dealer warranty service and replacement parts at no cost to the City at a local dealer preferably in the Surrey area; and
  • Provision of post-delivery services and parts availability at a local dealer, preferably in the Surrey area.

RFQ document for download:
Truck with Tipping Deck Specialist Body for Garbage Collection (.pdf)
Schedule B - Form of Quotation (.doc)

Addenda
If the City determines that an amendment is required to this RFQ, the City Representative will issue a written addendum by posting it on the BC Bid Website at www.bcbid.gov.bc.ca (the “BC Bid Website”) and the City Website at www.surrey.ca (the “City Website”) that will form part of this RFQ.  It is the responsibility of Contractors to check the BC Bid Website and the City Website for addenda.  The only way this RFQ may be added to, or amended in any way, is by a formal written addendum.  No other communication, whether written or oral, from any person will affect or modify the terms of this RFQ or may be relied upon by any Contractor.  By delivery of a Quotation, the Contractor is deemed to have received, accepted and understood the entire RFQ, including any and all addenda.

All inquiries related to this Request for Quotation ("RFQ") should be directed in writing to the contact person named below.